0

Full Content is available to subscribers

Subscribe/Learn More  >

Development of Contemporary Welding Procedures for Heavy Wall Hot Tap Split Tee Longitudinal Seam Welds

[+] Author Affiliations
Mark Atkinson, Simon Slater

MACAW Engineering Ltd., Newcastle Upon Tyne, UK

Paper No. IPC2016-64388, pp. V003T05A047; 10 pages
doi:10.1115/IPC2016-64388
From:
  • 2016 11th International Pipeline Conference
  • Volume 3: Operations, Monitoring and Maintenance; Materials and Joining
  • Calgary, Alberta, Canada, September 26–30, 2016
  • Conference Sponsors: Pipeline Division
  • ISBN: 978-0-7918-5027-5
  • Copyright © 2016 by ASME

abstract

Historically, the manual metal arc welding (MMA) process has been used for welding of full encirclement split tees on hot tap connections for gas transmission pipelines. The National Grid high pressure gas transmission network currently consists of pipelines up to and including 1219 mm outside diameter. The large diameter pipes require split tee assemblies up to 80 mm thick. The arc time to complete welding can be considerable and requires multiple welders to complete welding in one continuous operation.

The qualification of a mechanised gas shielded flux cored arc welding (GSFCAW) procedure for welding the longitudinal seams on large diameter tee connections would realise significant operational and cost benefits over the MMA method. The equipment for mechanised field welding is readily available for a large number of applications across many industries. Recent advances in the technology suggest that a suitable mechanised procedure can be developed for the longitudinal weld seams of split tee assemblies.

The primary aim of this project was to qualify a mechanised GSFCAW process and set of procedures in line with the National Grid specification for welding longitudinal seams of split tee assemblies. A comprehensive welding and test schedule was performed using 50 mm tee material. Welding was performed using the Firefly welding system in three positions, flat, overhead and horizontal to cover the full range of welding positions required for tee connections with either horizontal or vertical off-take branches.

Based on the mechanical testing and non-destructive examination (NDE) results, the combination of process and consumables used in this project have been qualified in accordance with the National Grid specification.

A number of quality issues were observed during welding and recommendations to address these have been identified. The travel speeds achieved using the GSFCAW process are up to twice those recorded when welding a similar size fitting using MMA. Even after considering the remedial work required to rectify quality issues, the overall welding times recorded using the GSFCAW process were lower than those recorded on a similar size fitting welded on site using the MMA process.

Copyright © 2016 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In