0

Full Content is available to subscribers

Subscribe/Learn More  >

Results of the Full Scale Testing of the Remote Dismantling in Greifswald NPP

[+] Author Affiliations
Ralf Borchardt, Jürgen Raasch

Energiewerke Nord GmbH, Lubmin, Germany

Paper No. ICEM2003-4777, pp. 1789-1794; 6 pages
doi:10.1115/ICEM2003-4777
From:
  • ASME 2003 9th International Conference on Radioactive Waste Management and Environmental Remediation
  • 9th ASME International Conference on Radioactive Waste Management and Environmental Remediation: Volumes 1, 2, and 3
  • Oxford, England, September 21–25, 2003
  • Conference Sponsors: Nuclear Engineering Division and Environmental Engineering Division
  • ISBN: 0-7918-3732-7 | eISBN: 0-7918-3731-9
  • Copyright © 2003 by ASME

abstract

For the dismantling of the pressure vessels and internals of the Greifwald WWER units 1–4, remote dismantling procedures are necessary. In order to realise this, 3 different cutting areas are used, i.e.: a wet cutting pool for highly activated parts, a dry cutting area for less activated parts and a specific cutting area for the annular water tank. Techniques and procedures were tested in a mock-up installation, with original components from the not operated reactor units 7 and 8. Special emphasis was given to evaluate the expected radiation exposure of the personnel, the maximum application time of the tools and the minimization of the secondary waste. The complete testing program was executed from October 1999 to September 2002. The authorised expert was involved in all steps of the testing. Thus a firm basis for the licensing and the execution of the remote dismantling could be established. Based on the results of the model dismantling and the selection of tools and procedures, the times necessary for the different operation steps could be calculated. With these figures, the manpower and the ambient dose rate it was possible to calculate the time need for the dismantling and also the expected dose commitment. This information was mandatory for the project planning and the preparation of the licensing documents. Presently the implantation of components and systems are going on in unit 2 and the start of cutting of the first activated pressure vessel is scheduled for end of 2003.

Copyright © 2003 by ASME
Topics: Testing

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In