0

Full Content is available to subscribers

Subscribe/Learn More  >

Underground Research Laboratories in Japan: What Are the Important Factors for Facilities Design?

[+] Author Affiliations
T. Sato, S. Mikake, M. Sakamaki, K. Aoki, S. Yamasaki, N. Shigeta, S. Takeda

JNC

Paper No. ICEM2003-4736, pp. 1333-1339; 7 pages
doi:10.1115/ICEM2003-4736
From:
  • ASME 2003 9th International Conference on Radioactive Waste Management and Environmental Remediation
  • 9th ASME International Conference on Radioactive Waste Management and Environmental Remediation: Volumes 1, 2, and 3
  • Oxford, England, September 21–25, 2003
  • Conference Sponsors: Nuclear Engineering Division and Environmental Engineering Division
  • ISBN: 0-7918-3732-7 | eISBN: 0-7918-3731-9
  • Copyright © 2003 by ASME

abstract

This paper describes the current status of two Japanese off-site Underground Research Laboratories (URLs) Projects, one for crystalline rock and the other for sedimentary rock. This paper is focused on mechanical stability and ventilation, important factors relevant to the design and construction of deep underground facilities. High-pressure inflow, another important factor, will be included in the URL project for crystalline rock. The site of the URL project for crystalline rock is located in Mizunami, Gifu, in the central part of the main island of Japan. The regional geology consists of the Tertiary and Quaternary sedimentary rocks overlying Cretaceous granitic basement. Surface-based investigations, including geological mapping, a seismic refraction survey and shallow borehole investigations, and site preparation at the MIU (Mizunami Underground Research Laboratory) Project site have started in 2002. Numerical analysis is carried out to understand mechanical stability around the openings. The ventilation system design is based on numerical analysis using a ventilation network model. Grouting against the high-pressure inflow is planned. Conceptual design for the MIU at present is as follows: • Two 1,000 m shafts, a Main Shaft (6.5m φ) and a Ventilation shaft (4.5m φ); • Two experimental levels, the Main Stage at 1,000 m and the Middle Stage, at 500 m depths. The site of the URL project for sedimentary rock is located in Horonobe, Hokkaido, north of the main island of Japan. The geology consists of Tertiary sedimentary rocks. Surface-based investigation phase started in 2001. Numerical analysis is carried out to understand mechanical stability of the openings, and to design support. The numerical analysis using ventilation network model is carried out to design the ventilation system and disaster prevention method. Conceptual design for the Hnb-URL at present is as follows: • Two 500 m shafts and a Ventilation shaft; • Two experimental levels, the Main Stage at 500 m and the Middle Stage at 250 m depths.

Copyright © 2003 by ASME
Topics: Design

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In