0

Full Content is available to subscribers

Subscribe/Learn More  >

Decommissioning Cost Calculation Code Based on Proposed Standardised List of Items for Costing Purposes With Integrated Material and Radioactivity Flow Control and Integrated Cost Allocating System

[+] Author Affiliations
Vladimir Daniška, Ivan Rehak, Marek Vasko, Jozef Pritrsky, Peter Bezak, Kristina Kristofova

DECOM

Paper No. ICEM2003-4824, pp. 775-783; 9 pages
doi:10.1115/ICEM2003-4824
From:
  • ASME 2003 9th International Conference on Radioactive Waste Management and Environmental Remediation
  • 9th ASME International Conference on Radioactive Waste Management and Environmental Remediation: Volumes 1, 2, and 3
  • Oxford, England, September 21–25, 2003
  • Conference Sponsors: Nuclear Engineering Division and Environmental Engineering Division
  • ISBN: 0-7918-3732-7 | eISBN: 0-7918-3731-9
  • Copyright © 2003 by ASME

abstract

In 1999 was issued commonly by EC, IAEA and OECD the document “A Proposed Standardised List of Items for Costing Purposes in the Decommissioning of Nuclear Installations” (PSL). The main aim of this document was to establish a standard platform for structure of presented decommissioning costs. The decommissioning costs calculated in various projects have in general different structure and for presenting the decommissioning costs in PSL structure, additional recalculation or rearrangement of data are needed. This can increase the uncertainty of data or it is not sure if they really reflect the cost defined in the PSL structure. The paper describes a newly developed cost calculation code, which respect the PSL structure. The calculated costs data are compatible with the standardised structure. The code is intended to use for decommissioning planning of a NPP with a non-standard radiological situation, shutdown after an accident For this purpose the code has an integrated material and radionuclide resolved radioactivity flow control system in calculation process which enables a direct calculation link between the input material and radiological inventory data and the calculated costs and other decommissioning parameters for increasing the accuracy of calculated data. The code has an integrated cost allocating system for generating of user defined working breakdown structure of the decommissioning project with allocated costs calculated in PSL structure. The working breakdown structure can be on-line optimised using the standard Microsoft Office Project Planning tool software.

Copyright © 2003 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In