0

Full Content is available to subscribers

Subscribe/Learn More  >

Status of the Salt Waste Processing Facility at the Savannah River Site

[+] Author Affiliations
Terrel J. Spears, James W. McCullough

U.S. Department of Energy, Washington, DC

Harry D. Harmon, Robert K. Leugemors

Pacific Northwest National Laboratory, Richland, WA

Paper No. ICEM2003-4651, pp. 189-196; 8 pages
doi:10.1115/ICEM2003-4651
From:
  • ASME 2003 9th International Conference on Radioactive Waste Management and Environmental Remediation
  • 9th ASME International Conference on Radioactive Waste Management and Environmental Remediation: Volumes 1, 2, and 3
  • Oxford, England, September 21–25, 2003
  • Conference Sponsors: Nuclear Engineering Division and Environmental Engineering Division
  • ISBN: 0-7918-3732-7 | eISBN: 0-7918-3731-9
  • Copyright © 2003 by ASME

abstract

The Department of Energy’s (DOE) Savannah River Site (SRS) High-Level Waste (HLW) Program is responsible for storage, treatment, and immobilization of HLW for disposal. The Salt Processing Program (SPP) is the salt (soluble) waste treatment portion of this effort. The overall SPP encompasses the selection, design, construction and operation of treatment technologies to prepare the salt waste feed material for the site’s Saltstone Facility and vitrification facility (Defense Waste Processing Facility). Major constituents that must be removed from the salt waste include actinides, strontium, cesium, and entrained sludge. In fiscal year (FY) 2002, research and development (R&D) on the actinide and strontium removal and Caustic-Side Solvent Extraction (CSSX) processes transitioned from technology development for baseline process selection to providing input for conceptual design of the Salt Waste Processing Facility (SWPF), a key component at the SRS SPP. This work included laboratory studies, bench-scale tests, and prototype equipment development. To implement the salt waste treatment technologies, DOE initiated a competitive procurement process to select Engineering, Procurement, and Construction (EPC) contractors for design of the SWPF. The Department awarded EPC contracts to Parsons Infrastructure & Technology Group, Inc. and Foster Wheeler USA Corporation for preparation of conceptual designs (Phase I) for the SWPF. The two EPC contractors began conceptual design activities in September 2002 and are scheduled to complete this work in January 2004. After evaluation of the conceptual designs, DOE will down select one EPC contractor to continue with final design, construction, and hot commissioning (Phase II). Hot startup of the SWPF is targeted for December 2009.

Copyright © 2003 by ASME
Topics: Rivers

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In