0

OM Code Activities for New Reactors PUBLIC ACCESS

[+] Author Affiliations
Ronald Lippy

True North Consulting, LLC, Omaha, NE

Paper No. NRC2014-5012, pp. 316-324; 9 pages
doi:10.1115/NRC2014-5012
From:
  • ASME/NRC 2014 12th Valves, Pumps, and Inservice Testing Symposium
  • ASME/NRC 2014 12th Valves, Pumps, and Inservice Testing Symposium
  • Rockville, Maryland, USA, June 23–25, 2014
  • Conference Sponsors: ASME
  • ISBN: 978-0-7918-9932-8
  • Compilation Copyright © 2019 ASME

abstract

The ASME (formerly the American Society of Mechanical Engineers) code titled Operation and Maintenance of Nuclear Power Plants (OM Code), Division 1, “Section IST: Rules for Inservice Testing of Light-Water Reactor Power Plants,” defines a post-2000 plant as a nuclear power plant that was issued (or will be issued) its construction permit or its combined license for construction and operation by the applicable regulatory authority on or after January 1, 2000. The New Reactors OM Code (NROMC) Task Group (TG) of the ASME OM Code Committee is assigned the task of ensuring that the preservice testing (PST) and inservice testing (IST) provisions in the ASME OM Code are adequate to provide reasonable assurance that pumps, valves, and dynamic restraints (snubbers) for post-2000 plants will operate when needed. The NROMC TG has prepared updated guidance for pumps and pyrotechnically operated (squib) valves in new reactors that has been incorporated in the ASME OM Code. Currently, the NROMC TG is preparing proposed guidance for surveillance of safety-significant pumps, valves, and dynamic restraints in nonsafety systems at post-2000 plants that employ passive safety-related post-accident heat-removal systems (referred to as passive post-2000 reactors).

The NROMC TG is also evaluating pump and valve surveillance provisions that would ensure that safety-significant components in small modular reactor (SMR) designs are verified to be operationally ready while providing flexibility to accommodate potentially extended refueling cycles associated with these post-2000 plants. There are several other changes and evaluations being performed by the NROMC TG to provide reasonable assurance of the operational readiness of safety-significant pumps, valves, and dynamic restraints while still weighing the cost-effectiveness of the requirements. The NROMC TG also considers risk insights in its evaluation of PST and IST provisions for post-2000 plants. This paper discusses the NROMC TG activities to develop the recent and planned improvements to the PST and IST provisions in the ASME OM Code to address pumps, valves, and dynamic restraints in new reactors.

Paper published with permission.

Compilation Copyright © 2019 ASME
This article is only available in the PDF format.

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In