0

Full Content is available to subscribers

Subscribe/Learn More  >

A Method to Analyze the Impact of Inline Inspection Accuracy on Integrity Management Program Planning of Pipelines

[+] Author Affiliations
Mingjiang Xie, Zhigang Tian

University of Alberta, Edmonton, AB, Canada

Jeff Sutherland, Bingyan Fang, Bill Gu

Baker Hughes, a GE company, Calgary, AB, Canada

Paper No. IPC2018-78423, pp. V001T03A051; 9 pages
doi:10.1115/IPC2018-78423
From:
  • 2018 12th International Pipeline Conference
  • Volume 1: Pipeline and Facilities Integrity
  • Calgary, Alberta, Canada, September 24–28, 2018
  • Conference Sponsors: Pipeline Division
  • ISBN: 978-0-7918-5186-9
  • Copyright © 2018 by ASME

abstract

A pipeline integrity management program is greatly affected by integrity planning methods and inline inspection (ILI) tool performance. In integrity management program planning, inspection and maintenance activities are in common practice, determined from risk and integrity assessment practices with the objective to reduce risk and effectively exceed a reliability target for the safe operation of the pipeline. An efficient and effective integrity planning method can address the most significant risk and optimize the operational and maintenance costs.

In this paper, a method is presented for analyzing the impact of ILI tool accuracy on integrity planning for pipelines for fatigue cracks. Crack inspection and threat of fatigue cracking was used as the working case for the analysis although the approach could potentially be used for any pipeline threat type. The proposed method is based on the use of a Monte Carlo simulation framework, where initial crack defect size and ILI measurement errors are considered as key random variables.

The integrity (severity) assessment of the crack population scenarios used the CorLAS™ burst pressure model, and the Paris’ law crack growth model based on API 579. The subsequent pipeline reliability assessments also considered single and multiple cracks scenarios. Using a reliability / probability of failure (PoF) approach, the impact of ILI tool accuracy and initial crack size on when to set reinspection and reassessment intervals was investigated.

Furthermore, integrity program cost scenarios for pipeline integrity programs with multiple cracks was also evaluated with respect to different (crack) populations, pipe conditions and ILI accuracies. A sensitivity analysis was performed considering different inspection costs, maintenance costs and relative crack severity for pipelines with financial metrics. Various scenarios were discussed regarding maintenance and inspection planning and a “total cost rate” for different situations. The proposed method can support integrity management program planning by linking risks with integrity plan costs associated with ILI accuracies, and optimal re-assessment intervals.

Copyright © 2018 by ASME
Topics: Inspection , Pipelines

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In