0

Full Content is available to subscribers

Subscribe/Learn More  >

Qualification Test of APR1400’s RCP Seal Under Extended SBO Condition

[+] Author Affiliations
Seok Cho, Seok Kim, Byoung-Uhn Bae, Yun-Je Cho, Yeon-Sik Kim, Woo-Jin Jeon, Young-Jung Youn

Korea Atomic Energy Research Institute, Daejeon, Korea

Sung-Min Chu, Sang-Youn Bang

DOOSAN Heavy Industries & Construction, Changwon, Korea

Paper No. ICONE26-82006, pp. V06BT08A017; 7 pages
doi:10.1115/ICONE26-82006
From:
  • 2018 26th International Conference on Nuclear Engineering
  • Volume 6B: Thermal-Hydraulics and Safety Analyses
  • London, England, July 22–26, 2018
  • Conference Sponsors: Nuclear Engineering Division
  • ISBN: 978-0-7918-5149-4
  • Copyright © 2018 by ASME

abstract

The US NRC’s post-Fukushima taskforce recommend extending the coping time up to at least 72 hours. In PWRs, the reactor coolant pump (RCP), and more particularly the shaft seal system located between the motor and the impeller, are directly impacted by these recommendations [AREVA, 2012]. Considering the importance of station black out (SBO) condition, seal performance of RCP shaft seal assembly shall be verified especially under an extended SBO condition. As a final stage of the localization program of the RCP, KAERI performed a seal LOCA test to verify seal leakage characteristics and to produce qualified experimental data for a plant safety analysis during the extended SBO condition. The seal verification test was performed using the localized seal assembly, fabricated by DOOSAN Heavy Industries & Construction Company of Korea, along with the commercial APR1400’s RCP for the Shin-Kori unit-5 nuclear plant to simulate an actual condition of the commercial nuclear power plant. Test condition was derived from a series of safety analysis for the APR1400 plant which reflected the FLEX procedure, and it consisted of three major sub-conditions such as high-pressure and high-temperature condition, saturated condition, and low-pressure and low-temperature condition. The major concerning point of the test is to measure a seal leakage flow rate during the test period. Total leakage amount and maximum leakage flow rate through the localized shaft seal assembly during the whole period of the test are in comparatively smaller ranges than the conventional input values used for a safety analysis of APR1400.

Copyright © 2018 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In