0

Full Content is available to subscribers

Subscribe/Learn More  >

Manage Successful Brownfield Applications

[+] Author Affiliations
Jian Sun, Kevin Blostic

Ansaldo STS USA, Pittsburgh, PA

Paper No. JRC2018-6143, pp. V001T03A005; 5 pages
doi:10.1115/JRC2018-6143
From:
  • 2018 Joint Rail Conference
  • 2018 Joint Rail Conference
  • Pittsburgh, Pennsylvania, USA, April 18–20, 2018
  • Conference Sponsors: Rail Transportation Division
  • ISBN: 978-0-7918-5097-8
  • Copyright © 2018 by ASME

abstract

This paper provides a unique perspective on successful brownfield railroad applications. It presents realistic challenges and solutions when applying a turnkey solution with a replacement or an overlay system. Brownfield commissioning takes place when an existing infrastructure is to upgrade to a new system with a different technology than the incumbent one. As signaling systems are getting more and more complex, it is extremely important to maintain robustness in the system design as well as project execution, such as logistics, documentation, and issue reporting. Many transportation authorities are moving from their current train control signaling system to a new system to combat obsolescence issues, to gain better system capacity, and to lower operation and maintenance costs. This paper discusses brownfield commissioning in general, and also presents specific cases in migration from a track circuit interlocking system to a Communications Based Train Control (CBTC) system. These two systems have distinct characteristics that provide opportunities of coexistence, but also introduce difficulties in mixed-mode operations.

Copyright © 2018 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In