0

Full Content is available to subscribers

Subscribe/Learn More  >

Prioritization of Rail Defect Inspection: A Risk-Based Optimization Approach

[+] Author Affiliations
Kang Zhou

Rutgers, The State University of New Jersey, Piscataway, NJ

Paper No. JRC2017-2226, pp. V001T01A004; 9 pages
doi:10.1115/JRC2017-2226
From:
  • 2017 Joint Rail Conference
  • 2017 Joint Rail Conference
  • Philadelphia, Pennsylvania, USA, April 4–7, 2017
  • Conference Sponsors: Rail Transportation Division
  • ISBN: 978-0-7918-5071-8
  • Copyright © 2017 by ASME

abstract

Broken rail is the most common type of mainline derailment cause on freight railroads in the United States. Detection and removal of rail defects is important for reducing the risk due to broken-rail-caused derailments. The current practice is to periodically inspect rails using non-destructive technologies, particularly ultrasonic inspection. Determining and prioritizing the frequency of rail defect inspection is an important decision in broken rail risk management. A generalized, risk-based mixed integer nonlinear programming (MINLP) model is developed which can optimize segment-specific rail defect inspection frequency to minimize route broken rail risk, especially under limited inspection resources. A numerical example to optimize the inspection frequency is used to illustrate the application of the model. The result analysis states that the optimization approach can lead to a risk reduction of broken rail compared to an empirical heuristic that all segments on the same route are tested at an equal frequency. A computer-aided decision making tool called “Rail Risk Optimizer” can be developed and implemented based on this risk-based optimization algorithm that automatically recommend an optimal segment-specific inspection scheduling. The tool will consider the risk factors such as rail age and annual traffic density to determine the segment-specific risk level. The research methodology and the practice-ready optimization tool can aid the railroad industry to mitigate broken rail risk in a cost-efficient manner.

Copyright © 2017 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In