0

Full Content is available to subscribers

Subscribe/Learn More  >

Overview of the Doel 3 and Tihange 2 Reactor Pressure Vessel Safety Cases

[+] Author Affiliations
Michel De Smet

Tractebel (ENGIE), Brussels, Belgium

Jean Van Vyve

Electrabel (ENGIE), Brussels, Belgium

Paper No. PVP2016-63878, pp. V01AT01A062; 11 pages
doi:10.1115/PVP2016-63878
From:
  • ASME 2016 Pressure Vessels and Piping Conference
  • Volume 1A: Codes and Standards
  • Vancouver, British Columbia, Canada, July 17–21, 2016
  • Conference Sponsors: Pressure Vessels and Piping Division
  • ISBN: 978-0-7918-5035-0
  • Copyright © 2016 by ASME

abstract

During the summer outages of 2012, large numbers of indications were found inside the shell material of the Doel 3 and Tihange 2 reactor pressure vessels (RPV). Therefore both plants remained in cold shutdown with their core unloaded. A series of examinations, tests and inspections were performed leading to the conclusion that the indications are hydrogen flakes and that they do not affect the structural integrity of the RPVs, regardless the operating mode, transient or accident condition. All this was documented in the Safety Case Reports issued in December 2012 and the Safety Case Addenda issued in April 2013.

Based on those reports, the Belgian Federal Agency for Nuclear Control (FANC) authorized the restart of both units that went back on-line in June 2013. In parallel, a number of requirements from the FANC were addressed such as the qualification of the applied Ultrasonic Testing (UT) procedure, and mechanical testing of irradiated specimens containing hydrogen flakes. The preliminary tests showed unexpected results regarding the shift in RTNDT (Reference Temperature for Nil Ductility Transition) under irradiation that could not confirm the hypotheses considered in the initial Safety Case Reports. Therefore, the Licensee Electrabel decided to shut down both plants immediately.

In order to fully address this concern, the material test programme was extended including several RPV materials and covering additional irradiation campaigns. This led to a modification of the irradiation embrittlement trend curves considered in the structural integrity analysis. In addition, the qualification of the UT procedure led to an updated cartography of the flakes. The structural integrity assessments of both RPVs were revised accordingly. The final Safety Case Reports, confirming the fitness-for-continued operation of both RPVs, were submitted to the FANC in October 2015. FANC allowed restart of both units on November 17th, 2015.

The paper gives a historical overview of the Doel 3 and Tihange 2 RPV Safety Cases and explains how the roadmap was built in order to demonstrate the RPV’s structural integrity in the presence of hydrogen flakes.

Copyright © 2016 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In