0

Full Content is available to subscribers

Subscribe/Learn More  >

Assurance Management Implementation Within a Large Organization

[+] Author Affiliations
Ryan Sporns, Shireen Fader

Enbridge, Edmonton, AB, Canada

Paper No. IPC2016-64625, pp. V002T01A023; 8 pages
doi:10.1115/IPC2016-64625
From:
  • 2016 11th International Pipeline Conference
  • Volume 2: Pipeline Safety Management Systems; Project Management, Design, Construction and Environmental Issues; Strain Based Design; Risk and Reliability; Northern Offshore and Production Pipelines
  • Calgary, Alberta, Canada, September 26–30, 2016
  • Conference Sponsors: Pipeline Division
  • ISBN: 978-0-7918-5026-6
  • Copyright © 2016 by ASME

abstract

Assurance Management is an essential aspect of a company’s governance. Assurance management can be defined as the “check” and “act” elements in any management system’s continual improvement cycle and is designed to provide stakeholders with current and accurate information about the adequacy, compliance, and effectiveness of its policies, programs, processes, and activities. An assurance management program may have activities that span beyond a particular management system’s scope, and often incorporates processes completed by various internal and external stakeholder groups. As such, it is vital to have a structured and disciplined approach to assurance management.

Over the past few years, Enbridge Pipeline Inc. Liquid Pipeline Business Unit (Enbridge) has been actively working on the development, implementation, and continual improvement of its Assurance Management Program (AMP) and associated processes, as part of our Integrated Management System (IMS) framework. The alignment of existing processes within a single structured program within Enbridge will provide a more coordinated approach as well as clear accountabilities on assurance functions within the organization. Enbridge’s AMP consists of three layers of “Check” defenses and is linked to core “act” processes in an effort to drive overall continual improvement throughout the organization.

The minimum requirements and considerations in establishing an adequate and effective AMP will be detailed within this paper based on the insight Enbridge has gathered through its journey in the implementation of its program within the organization. The paper will discuss the principles behind our AMP model as well as some of the challenges and successes experienced in implementing the AMP within Enbridge.

Copyright © 2016 by ASME
Topics: Pipelines , Cycles

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In