0

Innovative Project Management Techniques: Major International Pipeline Project FREE

[+] Author Affiliations
Robert G. Marshall, Robert Galatiuk, Michal Mensik

TransCanada International

Paper No. IPC2000-178, pp. V001T05A021; 10 pages
doi:10.1115/IPC2000-178
From:
  • 2000 3rd International Pipeline Conference
  • Volume 1: Codes, Standards and Regulations; Design and Constructions; Environmental; GIS/Database Development; Innovative Projects and Emerging Issues
  • Calgary, Alberta, Canada, October 1–5, 2000
  • Conference Sponsors: Pipeline Division
  • ISBN: 978-0-7918-4024-5
  • Copyright © 2000 by ASME

abstract

The Gasoducto del Pacifico Pipeline Project (GasPacifico), a 543 Km. pipeline transporting gas from the Province of Neuquen in Argentina to major cities in Chile, was accomplished in record time and under budget. The project was executed in a time frame even shorter than a previous fast track project in the region, the GasAndes Pipeline Project which also crossed the imposing Andes mountain range. Relying on the experience of the GasAndes Project, the Project Management Team, achieved success through the innovative implementation of project management techniques tailored to the specific challenges of the GasPacifico Project which include:

- The fast track nature of the project;

- Contractual obligations imposed by the Project Management Agreement between TransCanada International (TCI) and the owner, GasPacifico;

- Environmental contraints (route traversed a national park in Chile and areas of high erosion and instability);

- Seasonal constraints (one summer of construction, heavy rains in winter);

- Two countries with two sets of laws and stringent regulatory regimes;

- Procurement and importation of major equipment, materials and pipe.

The project management techniques balanced the triumvirate of quality, schedule and cost while managing the Owner’s risks within the boundary constraints of:

- Schedule commitments;

- Budget;

- Right-of-way acquisition;

- Regulatory Permits;

- Design challenges;

- Procurement limitations;

- Environment requirements;

- Construction challenges.

This paper presents the project management techniques used to manage these challenges, placing them in a relevant context, with the intent that learnings can be applied to other international projects.

Copyright © 2000 by ASME
This article is only available in the PDF format.

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In