0

The Environmental and Socio-Economic Impacts and Benefits Associated With Developing a Natural Gas Distribution System in Nova Scotia FREE

[+] Author Affiliations
Mario E. Buszynski

Phoenix.mg Inc.

Tanya Peacock

Sempra Atlantic Gas Inc.

Paper No. IPC2000-141, pp. V001T03A003; 6 pages
doi:10.1115/IPC2000-141
From:
  • 2000 3rd International Pipeline Conference
  • Volume 1: Codes, Standards and Regulations; Design and Constructions; Environmental; GIS/Database Development; Innovative Projects and Emerging Issues
  • Calgary, Alberta, Canada, October 1–5, 2000
  • Conference Sponsors: Pipeline Division
  • ISBN: 978-0-7918-4024-5
  • Copyright © 2000 by ASME

abstract

Novia Scotia, a province of about one million people, is located on the east coast of Canada. With the discovery of large natural gas reserves off the Scotian Shelf, offshore production platforms, undersea and onshore pipelines have been constructed to link the find with major markets in Boston by the end of 1999. The onshore pipeline through the province will allow a distribution system to be developed. This natural gas system will be the largest Greenfield development seen in North America for many years.

A billion-dollar expenditure is proposed to establish a local distribution company, which would construct and maintain around 8,000 kilometres of distribution and lateral pipelines in the province. An integral part of this program involves the provision of local benefits through hiring and purchasing of goods and services.

This paper describes aspects of the construction program and benefits plan proposed during the regulatory hearings in order to illustrate the methods used to ensure that the objectives of accessing the majority of Nova Scotians in a seven year planning horizon will be met. The varied landscapes to be crossed and specialized construction techniques to meet those challenges are discussed. The mechanisms in place to ensure maximum benefit for Nova Scotians are also discussed.

Up-to-date information will be presented to demonstrate how the benefits plan is being implemented. The successes of the benefits plan for the distribution utility and the other local megaproject in the province (Sable Offshore Energy) are compared. Conclusions will be drawn regarding successful strategies for implementing benefits plans related to large energy projects.

Copyright © 2000 by ASME
This article is only available in the PDF format.

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In