0

Importance of Effective Contract Management: GasPacifico Pipeline Project — A Case Study FREE

[+] Author Affiliations
Robert G. Marshall, Catherine Proctor

GasPacífico Project

Paper No. IPC2000-113, pp. V001T02A003; 11 pages
doi:10.1115/IPC2000-113
From:
  • 2000 3rd International Pipeline Conference
  • Volume 1: Codes, Standards and Regulations; Design and Constructions; Environmental; GIS/Database Development; Innovative Projects and Emerging Issues
  • Calgary, Alberta, Canada, October 1–5, 2000
  • Conference Sponsors: Pipeline Division
  • ISBN: 978-0-7918-4024-5
  • Copyright © 2000 by ASME

abstract

The GasPacífico Project involved the construction of 543 kilometres of NPS 20 and NPS 24 high pressure gas pipeline to connect the natural gas reserves in the Province of Neuquen, Argentina to the industrial and domestic demand in and near the city of Concepción, Chile. The pipeline crossed the Pampas of Argentina, the imposing Andes mountain range, the Coastal mountain range and the highly populated agricultural terrain of the Central Valley (740 individual landowners in total) leading to the west coast of Chile.

TransCanada International Ltd. was responsible for the overall project management of the GasPacifico Project which included design, construction and contract administration. In March 1998, the Project Team began the procedure to pre-qualify bidders, to prepare contract documents and to call for bids in preparation for the selection of construction contractors for the project. Contracts were awarded on July 30, 1998.

The proper selection of the Contractors was considered of paramount importance in the project because of the high degree of difficulty of the project, the budget constraints, and the very limited time available for construction.

The details of the process established for the selection of the Contractors for the GasPacífico Project as presented in this paper include:

• the criteria for the pre-qualification of the bidders;

• the technical evaluation format;

• the commercial evaluation format;

• sensitivity studies for unit rate items and extra work;

• the application of the technical/commercial evaluations to the final selection.

Copyright © 2000 by ASME
Topics: Pipelines
This article is only available in the PDF format.

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In