0

Full Content is available to subscribers

Subscribe/Learn More  >

Gainesville Regional Utilities Kelly Plant Asset Management With Cycling Operation

[+] Author Affiliations
Douglas Hilleman

Intertek AIM, Sunnyvale, CA

John M. Lindsay, Tim Hinson

Gainesville Regional Utilities, Gainesville, FL

Paper No. POWER2015-49148, pp. V001T09A003; 13 pages
doi:10.1115/POWER2015-49148
From:
  • ASME 2015 Power Conference collocated with the ASME 2015 9th International Conference on Energy Sustainability, the ASME 2015 13th International Conference on Fuel Cell Science, Engineering and Technology, and the ASME 2015 Nuclear Forum
  • ASME 2015 Power Conference
  • San Diego, California, USA, June 28–July 2, 2015
  • Conference Sponsors: Power Division
  • ISBN: 978-0-7918-5660-4
  • Copyright © 2015 by ASME

abstract

Gainesville Regional Utilities (GRU) is a fully vertically-integrated utility with electric power generation, transmission, and distribution system owned by the City of Gainesville, FL. We have two primary generating plant sites: Deerhaven with two conventional coal-fired steam units (DH1 and DH2) and John R. Kelly (JCC1) combined-cycle Unit 1. Kelly Station (the focus of this study) is located in southeast Gainesville near the downtown business district. It has one - 120 MW combined-cycle unit (JCC1) in 1 × 1 configuration, consisting of: one GE Frame 7E combustion turbine (dual fuel), one Applied Thermal Systems two pressure HRSG, one 50-year old Westinghouse steam turbine unit with cooling tower, fuel storage, pumping equipment, transmission, and distribution equipment.

In 2013, GRU with a seasonal peak load of approximately 500 MWs was to start receiving the output of a new 100 MW bio-fuel plant under a purchase power agreement. It was apparent that the operation of the GRU units would drastically change. It was predicted by GRU that DH2 a 255 MW coal unit would move to a cycling duty unit and the Kelly combined-cycle unit would be relegated to “peaking” operation. To better understand and predict future operational impacts, GRU contracted with Intertek AIM (APTECH) to conduct a Cost of Cycling study.

This paper is our presentation of the results of the study and the changes that were indicated by the cycling analysis to manage the GRU system at the lowest cost and to incorporate the new modes of cycling operation. The expected modes of operation based on the results of the study were reversed to use the lowest cost unit for frequent cycling of JCC1 and changed the previously base loaded coal unit DH2 into a seasonal unit with long seasonal shut downs. This paper further shows the actions implemented by GRU at Kelly station to improve the cycling response and reduce the damage impact of each cycle by managing the startup ramp rates of the limiting equipment. The plant had limited budget for capital improvements and focused principally on managing the cost by modifying the startup procedures using real time operating data.

Our conclusion was that by following the report recommendations, a new “Start Model” produced repeatable and acceptable results that minimized possible damage to the unit while meeting the need to use the renewable energy and support the customer by providing power at the lowest cost. The paper will demonstrate the improvement areas, the actual changes, and the results of those changes to the cycling data and the savings due to reduced damage.

Copyright © 2015 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In