0

Construction of a 700MW Combined Cycle Plant for YANAI Power Station No. 1 PUBLIC ACCESS

[+] Author Affiliations
S. Shirakura

The Chugoku Electric Power Co. Inc., Yanai, Japan

N. Ando

Hitachi, Ltd., Tokyo, Japan

K. Hoshino

Hitachi, Ltd., Hitachi, Japan

Paper No. 90-GT-371, pp. V004T10A012; 8 pages
doi:10.1115/90-GT-371
From:
  • ASME 1990 International Gas Turbine and Aeroengine Congress and Exposition
  • Volume 4: Heat Transfer; Electric Power; Industrial and Cogeneration
  • Brussels, Belgium, June 11–14, 1990
  • Conference Sponsors: International Gas Turbine Institute
  • ISBN: 978-0-7918-7907-8
  • Copyright © 1990 by ASME

abstract

The Chugoku Electric Power Co., Ltd. is currently constructing a 700MW combined cycle power plant at Yanai, Yamaguchi Prefecture, based on new design concepts.

This power plant consists of six single-shaft combined cycle units with construction in two phases.

Operation of the first phase, which includes three units with an output of 350 MW, will begin in November, 1990; operation of the second phase, which also includes three units with an output of 350 MW, will begin in December, 1992.

The notable features of this power plant are: High efficiency; short starting and stopping time; suitability for daily start/stop and large load variations; thorough NOx countermeasures; easy-to-use man-machine interface control systems; and short construction period based on improvement of construction methods.

The NOx countermeasures for the gas turbines are based on a newly-developed dry low NOx combustor which is designed so that the NOx emission level is 75 ppm or less for the entire load.

A functionally and hierarchically distributed digital control system has been used for the plant control system, so that the reliability, maintenability, and controllability will be improved.

In particular, an improvement was made to the man-machine interface. A CRT operation system and a large 110-inch screen are used together with an operation support system and a power plant office automation system.

Equipment installation is proceeding smoothly and field testing of the first units will begin in April, 1990.

Because this power plant is located in the Inland Sea National Park, thorough consideration has been taken in its appearance, such as color coordination, and landscaping of the power station area.

Copyright © 1990 by ASME
This article is only available in the PDF format.

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In