0

Full Content is available to subscribers

Subscribe/Learn More  >

Know-How and Experience of the Decommissioning of the Eurochemic Reprocessing Plant

[+] Author Affiliations
W. Notelteirs, B. Ooms, T. Huys

Belgoprocess, Dessel, Belgium

Paper No. ICEM2013-96209, pp. V002T03A031; 10 pages
doi:10.1115/ICEM2013-96209
From:
  • ASME 2013 15th International Conference on Environmental Remediation and Radioactive Waste Management
  • Volume 2: Facility Decontamination and Decommissioning; Environmental Remediation; Environmental Management/Public Involvement/Crosscutting Issues/Global Partnering
  • Brussels, Belgium, September 8–12, 2013
  • Conference Sponsors: Nuclear Engineering Division, Environmental Engineering Division
  • ISBN: 978-0-7918-5602-4
  • Copyright © 2013 by ASME

abstract

Belgoprocess started the industrial decommissioning of the main process building of the former Eurochemic reprocessing plant in 1987. In 2008 the eastern part was torn down and in 2010 the central part of the building was removed. The demolition of the third and last part is planned in 2014. At that point the area will be restored to brown field conditions.

During the 25 years of decommissioning the Eurochemic installations a lot of effort has been invested in improving the efficiency. The Belgian decommissioning policy is based on maximizing effort for decontamination with the goal of unconditional release and minimization of nuclear waste. As a result a number of installations have been implemented that reduce the processing costs, increase the output of decontamination and increase the speed of release measurements.

• The abrasive blasting installation is used to remove a thin layer from metal components and concrete objects.

• The concrete crushing and sampling installation is used as the final measurement before unconditional release of concrete debris.

• The concrete spec installation is used to separate the contaminated part from the non contaminated part of concrete debris.

As the end of the decommissioning project is approaching the time is right to look back and evaluate the course of the project. Looking back what were the key decisions during the project, what were important milestones and what could or should have been done differently knowing what we know now.

Copyright © 2013 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In