Decommissioning the Belgonucleaire Dessel MOX Plant: Presentation of the Project and Situation End August 2013

[+] Author Affiliations
J. M. Cuchet

Tractebel Engineering, Brussels, Belgium

H. Libon, C. Verheyen

Belgonucleaire S.A. / N.V., Dessel, Belgium

J. Bily

Studsvik GmbH, Pforzheim, Germany

S. Boden

SCK•CEN, Mol, Belgium

F. Joffroy

Tecnubel N.V., Dessel, Belgium

R. Walthéry

Belgoprocess, Dessel, Belgium

Paper No. ICEM2013-96020, pp. V002T03A006; 9 pages
  • ASME 2013 15th International Conference on Environmental Remediation and Radioactive Waste Management
  • Volume 2: Facility Decontamination and Decommissioning; Environmental Remediation; Environmental Management/Public Involvement/Crosscutting Issues/Global Partnering
  • Brussels, Belgium, September 8–12, 2013
  • Conference Sponsors: Nuclear Engineering Division, Environmental Engineering Division
  • ISBN: 978-0-7918-5602-4
  • Copyright © 2013 by ASME


BELGONUCLEAIRE has been operating the Dessel MOX plant at an industrial scale between 1986 and 2006. During this period, 40 metric tons of plutonium (HM) have been processed into 90 reloads of MOX fuel for commercial light water reactors. The decision to stop the production in 2006 and to decommission the MOX plant was the result of the shrinkage of the MOX fuel market due to political and commercial factors.

As a significant part of the decommissioning project of the Dessel MOX plant, about 170 medium-sized glove-boxes and about 1.200 metric tons of structure and equipment outside the glove-boxes are planned for dismantling.

The license for the dismantling of the MOX plant was granted by Royal Decree in 2008 and the dismantling started in March 2009. The dismantling works are carried out by an integrated organization under leadership and responsibility of BELGONUCLEAIRE; this organization includes 3 main contractors, namely Tecnubel N.V., the THV (‘Tijdelijke HandelsVereniging’) Belgoprocess / SCK•CEN and Studsvik GmbH and TRACTEBEL ENGINEERING as project manager.

In this paper, after having described the main characteristics of the project, the authors review the different organizational and technical options considered for the decommissioning of the glove-boxes; thereafter the main decision criteria (qualification of personnel and of processes, confinement, cutting techniques & radiation protection, safety aspects, alpha-bearing waste management) are analyzed as well.

Finally the progress, the feedback and the lessons learned at the end of August 2013 are presented, giving the principal’s and contractors point of view.

Copyright © 2013 by ASME



Interactive Graphics


Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In