0

Full Content is available to subscribers

Subscribe/Learn More  >

French Alternative Energies and Atomic Energy Commission Decommissioning Programme and Feedback Experience

[+] Author Affiliations
Philippe Guiberteau, Jean-Guy Nokhamzon

CEA DEN/DADN, CEN Saclay France, Gif sur Yvette, France

Paper No. ICEM2013-96016, pp. V002T03A003; 9 pages
doi:10.1115/ICEM2013-96016
From:
  • ASME 2013 15th International Conference on Environmental Remediation and Radioactive Waste Management
  • Volume 2: Facility Decontamination and Decommissioning; Environmental Remediation; Environmental Management/Public Involvement/Crosscutting Issues/Global Partnering
  • Brussels, Belgium, September 8–12, 2013
  • Conference Sponsors: Nuclear Engineering Division, Environmental Engineering Division
  • ISBN: 978-0-7918-5602-4
  • Copyright © 2013 by ASME

abstract

Since the French Atomic Energy Commission (CEA) was founded in 1945 to carry out research programs on use of nuclear, and its application France has set up and run various types of installations : research or prototypes reactors, process study or examination laboratories, pilot installations, accelerators, nuclear power plants and processing facilities. Some of these are currently being dismantled or must be dismantled soon so that the DEN, the Nuclear Energy Division, can construct new equipment and thus have available a range of R&D facilities in line with the issues of the nuclear industry of the future. Since the 1960s and 1970s in all its centers, the CEA has acquired experience and know-how through dismantling various nuclear facilities. The dismantling techniques are nowadays operational, even if sometimes certain specific developments are necessary to reduce the cost of operations. Thanks to availability of techniques and guarantees of dismantling program financing now from two dedicated funds, close to 15 B€ for the next thirty years, for current or projected dismantling operations, the CEA’s Nuclear Energy Division has been able to develop, when necessary, its immediate dismantling strategy. Currently, nearly thirty facilities are being dismantled by the CEA’s Nuclear Energy Division operational units with its industrial partners. Thus the next decade will see completion of the dismantling and radioactive clean-up of the Grenoble site and of the facilities on the Fontenay-aux-Roses site. By 2018, the dismantling of the UP1 plant at Marcoule, the largest dismantling work in France, will be well advanced, with all the process equipment dismantled. After an overview of the French regulatory framework, the paper will describe the DD&R strategy, programme and feedback experience inside the CEA’s Nuclear Energy Division and its progress since ICEM 14 in 2011’s conference in Reims.

Copyright © 2013 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In