0

Full Content is available to subscribers

Subscribe/Learn More  >

Study on SPMO Management of Contractor Special Process Personnel Qualification Under EPC Mode

[+] Author Affiliations
Hongwei Shen, Zhiyou Sun, Yang Shen

State Nuclear Power Engineering Company, Shanghai, China

Paper No. ICONE21-16517, pp. V001T01A039; 5 pages
doi:10.1115/ICONE21-16517
From:
  • 2013 21st International Conference on Nuclear Engineering
  • Volume 1: Plant Operations, Maintenance, Engineering, Modifications, Life Cycle and Balance of Plant; Nuclear Fuel and Materials; Radiation Protection and Nuclear Technology Applications
  • Chengdu, China, July 29–August 2, 2013
  • Conference Sponsors: Nuclear Engineering Division
  • ISBN: 978-0-7918-5578-2
  • Copyright © 2013 by ASME

abstract

Under the background of Sanmen AP1000 NPP Project, World’s First AP1000 Project, this article looks into SPMO management over contractor special process personnel qualification under EPC mode.

The project management mode is briefed and the theory basis of the study is discussed, in terms of nuclear safety regulation ASME NQA-1, HAF003 and industrial safety regulations, as well as quality management theory. Contractor special process personnel qualification is generally unmanageable, mainly resulting in negative chain quality problems, objective of the study aims at solving the problems and managerial dilemmas of contractor special process personnel qualification management on site.

Quality assurance system is maintained according to ASME NQA-1, and special process is implemented in compliance with the specification of special process control procedures developed for particular special processes, such as welding, NDE, painting, etc. Personnel training, authorization, certificate, operation experiences and pertinent requirements are specified in personnel qualification procedures. The method and process of special process personnel qualification management is created under SPMO quality assurance system, in the scope of SPMO management, while detailed and comprehensive classification of special process personnel qualification is defined with originality. On the basis of ingenious classification and management practice, the author summarizes a systematic management methodology of contractor special process personnel qualification under EPC mode. Classification management, standardized checklist implementation, and site surveillance are integrated for special process personnel management. Outstanding effect and performance are achieved by demonstrating the systematic management methodology, providing effective experience for follow-up AP1000 project which has significant meaning for enhancing contractor special process control and ensuring AP1000 construction quality.

Copyright © 2013 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In