0

Full Content is available to subscribers

Subscribe/Learn More  >

Simulation and Planning of Pipeline Emptying Operations

[+] Author Affiliations
Thomás Martinoia, Claudio Veloso Barreto

SIMDUT - PUC-Rio, Rio de Janeiro, RJ, Brazil

Jose Carlos D. C. da Rocha

White Martins Gases Industriais do Nordeste S.A., Camaçari, BA, Brazil

João Lavoura, Fausto M. P. Henriques

Transpetro, Rio de Janeiro, RJ, Brazil

Paper No. IPC2012-90432, pp. 603-611; 9 pages
doi:10.1115/IPC2012-90432
From:
  • 2012 9th International Pipeline Conference
  • Volume 1: Upstream Pipelines; Project Management; Design and Construction; Environment; Facilities Integrity Management; Operations and Maintenance; Pipeline Automation and Measurement
  • Calgary, Alberta, Canada, September 24–28, 2012
  • Conference Sponsors: International Petroleum Technology Institute, Pipeline Division
  • ISBN: 978-0-7918-4512-7
  • Copyright © 2012 by ASME

abstract

The pipeline pigging operation for emptying purposes is a common practice in the petroleum and gas transport industry. The emptying operation is employed for removal of the pipeline liquid products and substitution for an inert gas like nitrogen. This operation is necessary before pipeline maintenance or hydrostatic test procedures. The emptying operation applied for oil pipelines usually demands large volumes of nitrogen because of the pressure difference that is necessary to maintain the pig in a velocity that guarantee an efficient and safe operation. The nitrogen that is originally stored inside cryogenic vessels in liquid phase is pumped and vaporized to be injected into the pig launcher, after heating the gas. The gas injection and expansion inside the pipeline propel the pig, delivering the product that was in the pipeline at the receiver station. It is common to cut the nitrogen injection in a certain instant of the operation, before the pig reaches its destination. From then on, the expansion of the gas is able to finish the operation alone.

A dynamic simulator called DESLOCAN2 was developed by SIMDUT/PUC-Rio to simulate the pig motion during emptying operations with nitrogen in TRANSPETRO crude oil and refined products pipelines. In the operation planning phase the simulator is used to evaluate the gas mass flow rate, the inlet gas pressure and the nitrogen cut instant that can propel the pig to its destination with a minimum volume of nitrogen. The outlet liquid pressure is calculated using two simultaneous controllers: outlet flow rate based on maximum pig velocity and minimum outlet pressure that avoids slack line condition. The dynamic simulator also can be used as a forecast monitor of the pipeline pigging operation given the current inlet gas and outlet liquid conditions, allowing the visualization of actual and forecasted pipeline pressure profile, the pig velocity and position, the accumulative gas inside the pipeline and the volume of product removed.

The main objectives of this paper are: Present the mathematical modeling and considerations built in the simulator; Validate the model’s main hypothesis; Present the gained experience on building the model and planning an emptying operation of an existing pipeline: OSBAT 24.

Copyright © 2012 by ASME
Topics: Simulation , Pipelines

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In