0

Full Content is available to subscribers

Subscribe/Learn More  >

Determination of Significant Risk Threshold of Upstream Pipelines

[+] Author Affiliations
Hong Lu

Visser Consulting Ltd., Calgary, AB, Canada

Paper No. IPC2012-90192, pp. 1-7; 7 pages
doi:10.1115/IPC2012-90192
From:
  • 2012 9th International Pipeline Conference
  • Volume 1: Upstream Pipelines; Project Management; Design and Construction; Environment; Facilities Integrity Management; Operations and Maintenance; Pipeline Automation and Measurement
  • Calgary, Alberta, Canada, September 24–28, 2012
  • Conference Sponsors: International Petroleum Technology Institute, Pipeline Division
  • ISBN: 978-0-7918-4512-7
  • Copyright © 2012 by ASME

abstract

The pipeline risk assessment has been part of the integrity management in the industry in today’s environment of increasing regulatory and public oversight. One of the widely used risk assessment method is the score index method. This method has been used for more than two decades and is widely accepted in the pipeline industry. The input data is relatively easy to acquire. The method provides details of mitigation options and relative risk values. However, this method does not provide the simple decision making process.

In risk management, it is always the question to choose the most cost effective mitigation option to use limited resources. On the basis of score index risk assessment method, a method to correlate the probability of failure score with actual failure probability, and leak impact factor score with actual failure consequence in monetary units has been developed. This method applies the monetarily calibrated consequence factor to the probability of failure to obtain a normalized and calibrated risk in monetary unit. By comparing the cost of an estimated mitigation program, the decision can be made.

Recent regulations in Canada require that risk assessment must have a method to determine the significant risk threshold. Even though some industrial standards have some recommended methods or benchmark data for failure probability, there is no published method to determine the threshold of high risk. Some pipeline companies have the in-house personnel to develop an advanced method to meet regulation requirement. However, many pipeline companies need to have a practical and economical method to determine the significant risk threshold to meet regulation requirement, and to effectively allocate resources. This paper develops a method to determine the significant risk threshold that can be used as a decision-making criterion in pipeline risk management.

This process is practical for industrial application, especially for upstream companies where operators have limited resources for advanced risk assessment. A case study is presented using this method based on upstream pipelines.

Copyright © 2012 by ASME
Topics: Pipelines , Risk

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In