0

Full Content is available to subscribers

Subscribe/Learn More  >

Innovative Approach for a Pipeline Pre-Operation

[+] Author Affiliations
José Fernando M. Ferioli

TRANSPETRO – Petrobras Transporte S.A., Rio de Janeiro, RJ, Brazil

Paper No. IPC2004-0495, pp. 1983-1988; 6 pages
doi:10.1115/IPC2004-0495
From:
  • 2004 International Pipeline Conference
  • 2004 International Pipeline Conference, Volumes 1, 2, and 3
  • Calgary, Alberta, Canada, October 4–8, 2004
  • Conference Sponsors: International Petroleum Technology Institute
  • ISBN: 0-7918-4176-6 | eISBN: 0-7918-3737-8
  • Copyright © 2004 by ASME

abstract

“Oleoduto Cabiúnas REDUC - OSDUC II”, a new 183km 10in pipeline, started operating for TRANSPETRO, a subsidiary of PETROBRAS, in September 2002, transporting Natural Gas Liquids from Cabiúnas Terminal, the on-shore facility responsible for treating all natural gas coming from Campos basin crude oil production fields, to a NGL Fractionation Plant (UFL) inside Duque de Caxias PETROBRAS refinery (REDUC), near Rio de Janeiro. Because the NGL delivered from natural gas treatment process was absolutely free of water and considering the high sulfur content in the wet gas coming to shore, the pipeline was designed to be dried with nitrogen, after construction and hydrostatic tests, regardless of pipe materials specifications, in order to prevent corrosion and hydrogen-induced cracking. Commissioning, the next step, could not be performed as a simple and single operation, because the Liquids Recovery Plant (URL), in the first of three development phases, did not have the capacity either to feed main pipeline pump with the minimum flow required to maintain continuous operation or to assure pig run to be performed within the ideal speed range to guarantee good sealing efficiency. After none of the few available alternatives proved to be suitable, there was no doubt that an innovative approach was the only way to overcome the challenges on commissioning the line under such sort of restrictions despite running risks of postponing pipeline startup in case the filling process did not succeed accordingly. Then, TRANSPETRO engineering team came up with an unusual solution where the line fill process was divided into 8 pumping-stoppage cycles along with the use of polyurethane pigs as a mechanical barrier between liquid and gas phases. This work describes all key factors from pipelines conceptual design, to commissioning procedures and implementation, as well as the tools used to forecast flow conditions and all critical events.

Copyright © 2004 by ASME
Topics: Pipelines

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In