0

Full Content is available to subscribers

Subscribe/Learn More  >

The Risk Assessment Module PSL as an Obvious Part of an Integral Pipeline (Integrity) Management System

[+] Author Affiliations
Ad Pijnacker Hordijk, Jeroen Zanting, Rien Kornalijnslijper

Gastransport Services, The Netherlands

Robert Kuik

Gasunie Research, The Netherlands

Paper No. IPC2004-0305, pp. 1375-1384; 10 pages
doi:10.1115/IPC2004-0305
From:
  • 2004 International Pipeline Conference
  • 2004 International Pipeline Conference, Volumes 1, 2, and 3
  • Calgary, Alberta, Canada, October 4–8, 2004
  • Conference Sponsors: International Petroleum Technology Institute
  • ISBN: 0-7918-4176-6 | eISBN: 0-7918-3737-8
  • Copyright © 2004 by ASME

abstract

This paper will give an overview of the history of PiMS and the new developments within Gastransport Services regarding the implementation of an integral Pipeline (integrity) Management System and especially and also in more detail the implementation, testing and verifying of a Risk Assessment tool, as an obvious part of PiMS. The design of the pipeline network in the Netherlands was based on the ASME B31G guidelines, as a sound engineering practice. The construction started early 1960 in a very rapid tempo. The control and maintenance in those years was executed on a paper based system with steady state frequencies of measurements uniformly distributed all over the network. With the nowadays databases and computer systems all kind of analyses beyond the capacity of a pipeline engineer can be carried out. These analyses have been made possible by outstanding Research of different companies, Joint Industry Programs and international investigations executed by a variety of different well known groups. At that time however an integration of all the data and stand-alone models into one single (PiMS-)system with one or more linked databases and controlled by one process control system was not a major option due to a lack of IT-possibilities and management objectives. Due to very fast developments in IT, recent incidents in the industry all over the world, the change in management objectives to have a faster and a better control over the pipeline safety, reliability and associating costs a strong desire for a PiMS-process control system was born.

Copyright © 2004 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In