0

Full Content is available to subscribers

Subscribe/Learn More  >

State of the Art for Fabricating and Emplacing Concrete Containers Into Large Horizontal Disposal Caverns in the French Geological Repository

[+] Author Affiliations
Jean-Michel Bosgiraud, Maurice Guariso, François Pineau

Agence Nationale pour la Gestion des Déchets Radioactifs (ANDRA), Châtenay-Malabry, France

Paper No. ICEM2011-59267, pp. 1429-1435; 7 pages
doi:10.1115/ICEM2011-59267
From:
  • ASME 2011 14th International Conference on Environmental Remediation and Radioactive Waste Management
  • ASME 2011 14th International Conference on Environmental Remediation and Radioactive Waste Management, Parts A and B
  • Reims, France, September 25–29, 2011
  • Conference Sponsors: Nuclear Engineering Division and Environmental Engineering Division
  • ISBN: 978-0-7918-5498-3
  • Copyright © 2011 by ASME

abstract

The research and development work presented in this paper was initialized by Andra in 2007. The work necessary for manufacturing and testing a full scale demonstrator is presently implemented. The case story is twofold. The first part is related to the initial development of a high performance concrete formulation used for fabricating concrete storage containers (containing Intermediate Level and Long Lived Waste primary canisters) to be stacked and emplaced into 400-m long concrete lined horizontal disposal vaults (also called cavern), excavated in the Callovo-Oxfordian clay host formation at a 550 to 600-m depth, with an inside diameter of approximately 8-m. The fabrication of the concrete boxes is illustrated. The second part presents the outcome at the end of the detailed design phase, for a system which is now being manufactured (for further test and assembly), for the emplacement of the concrete containers inside the vault. The application was engineered for remote emplacing a pile of 2 concrete containers (the containers are preliminarily stacked in a pile of 2, inside a hot cell, thanks to a ground travelling gantry crane). The emplacement process is justified and the related emplacement synoptic is illustrated. The test campaign is scheduled in 2011–2012. The successful completion of the technical trials is mandatory to confirm the mechanical feasibility of remotely emplacing concrete containers into large horizontal disposal caverns over long distances. The later display of the machinery at work in Andra’s showroom will be instrumental for the confidence building process involving the various stakeholders concerned by the public enquiry period (mid-2013) preceding the deep geological repository license application (2014–2015).

Copyright © 2011 by ASME
Topics: Concretes , Containers

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In