0

Full Content is available to subscribers

Subscribe/Learn More  >

External Corrosion and Internal Corrosion Direct Assessment Validation Project

[+] Author Affiliations
Carl A. Mikkola, Christina L. Case

Enbridge Midcoast Energy, L.P., Houston, TX

Kevin C. Garrity

CC Technologies, Dublin, OH

Paper No. IPC2004-0103, pp. 1095-1105; 11 pages
doi:10.1115/IPC2004-0103
From:
  • 2004 International Pipeline Conference
  • 2004 International Pipeline Conference, Volumes 1, 2, and 3
  • Calgary, Alberta, Canada, October 4–8, 2004
  • Conference Sponsors: International Petroleum Technology Institute
  • ISBN: 0-7918-4176-6 | eISBN: 0-7918-3737-8
  • Copyright © 2004 by ASME

abstract

In January, 2003, Enbridge Midcoast Energy, L.P., a subsidiary of Enbridge Energy Partners, L.P., implemented a comprehensive direct assessment development and validation project for its Natural Gas Business segment; a project intended to demonstrate the validity of External Corrosion and Internal Corrosion Direct Assessment (ECDA and ICDA). The work began in January 2003 and was concluded in June 2003. The primary goal of the project was to demonstrate that External Corrosion Direct Assessment and Internal Corrosion Direct Assessment as performed in compliance with the NACE and INGAA methodologies could be used to effectively verify and manage the integrity of non-piggable and non-interruptible natural gas pipeline segments. The programs were validated by in-line inspection (ILI) using high-resolution magnetic flux leakage tools and field verification digs. The objective of the project was to receive approval from the Texas Railroad Commission to use direct assessment (“DA”), where demonstrated to be appropriate, for integrity verification and management of pipeline systems that are not verifiable through other approved means. The Enbridge DA Validation Project was successfully completed and is considered to be one of the leading DA validation projects undertaken to date in the U.S. A total of 12,000 manhours and over $1MM was expended in performing the pre-assessment to identify a candidate pipeline, develop detailed procedures for DA execution and implementation, perform indirect surveys, modify pipe and complete cleaning pig runs, gauge pig runs, dummy pig runs, intelligent pig runs, perform detailed direct examinations and perform detailed analysis of the results including the preparation of the final report. This paper is intended to describe the steps that Enbridge took in validating DA.

Copyright © 2004 by ASME
Topics: Corrosion

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In