0

Full Content is available to subscribers

Subscribe/Learn More  >

Kola Peninsula Radwaste Management in the Framework of the Italian-Russian Cooperation Agreement for Global Partnership

[+] Author Affiliations
Massimiliano Nobile, Dmitry Izmailov, Antonino Spadoni, Oleg Uryvskiy

Project Management Unit, Moscow, Russian Federation

Paper No. ICEM2011-59392, pp. 687-697; 11 pages
doi:10.1115/ICEM2011-59392
From:
  • ASME 2011 14th International Conference on Environmental Remediation and Radioactive Waste Management
  • ASME 2011 14th International Conference on Environmental Remediation and Radioactive Waste Management, Parts A and B
  • Reims, France, September 25–29, 2011
  • Conference Sponsors: Nuclear Engineering Division and Environmental Engineering Division
  • ISBN: 978-0-7918-5498-3
  • Copyright © 2011 by ASME

abstract

In 2003 a Cooperation Agreement, envisaging a grant of 360 Meuro in 10 years, was signed between Italy and Russia in the framework of the “so-called” Global Partnership Program. So far, in five years of concrete work, a total of 146 Meuro have been engaged through 33 contracts and 121 Meuro have been already paid. Together with other significant lines of activities the management of waste, presently located at Andreeva Bay site, is surely the most important one, not only for the amount of allocated funds (about the half of available ones) but also for the urgency to solve serious environmental problems linked to the actual unsafe conditions of these waste, both as regards possible incidents or malicious attacks from outside. Volume of Low Level and Intermediate Level (LL/IL) waste at Andreeva Bay site are 17000 tons and 3000 tons, respectively for solid and liquid; moreover is expected, during the next 15 years, the production of additional 33000 tons of liquid and 8000 tons of solid, due to the need of demolishing existing facilities and final closing of the site. As regards radwaste management facilities, the solution defined in OBIN (justification of investment) has been analyzed and critically reviewed. After the completion of a conceptual study, the construction of three facilities (solid and liquid treatment ones and a protective structure for storing on site temporarily conditioned waste) was decided and a contract was assigned in 2010 to Ansaldo Nucleare/AtomStroyExport for the detailed design of the above mentioned facilities, which is expected to be completed in 2012. Some important modifications to the initial time schedule have been taken into account and now the operation of the facilities is expected by 2015, two years before the previous estimate.

Copyright © 2011 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In