0

Full Content is available to subscribers

Subscribe/Learn More  >

Two Case Studies of Trenchless Technologies in the Urban Environment

[+] Author Affiliations
Dave Krywiak, Werner Kiefer

Stantec Consulting Ltd., Amherst, NY

David Arnold, Kirstine Hull

EPCOR Distribution Inc., Edmonton, AB, Canada

Paper No. IPC2004-0683, pp. 867-873; 7 pages
doi:10.1115/IPC2004-0683
From:
  • 2004 International Pipeline Conference
  • 2004 International Pipeline Conference, Volumes 1, 2, and 3
  • Calgary, Alberta, Canada, October 4–8, 2004
  • Conference Sponsors: International Petroleum Technology Institute
  • ISBN: 0-7918-4176-6 | eISBN: 0-7918-3737-8
  • Copyright © 2004 by ASME

abstract

In 1998, EPCOR undertook an inspection program on the condition of 14 of their underground high voltage transmission lines where they crossed the riverbed of the North Saskatchewan River within the City of Edmonton. Based on the findings of this investigation, it was determined that two of the river crossings were at serious risk of mechanical damage. It was decided that they would be replaced by horizontal directional drilling (HDD) methods, at a sufficient depth into the bedrock below the river bottom to remove any risk of failure due to mechanical damage. This paper examines all phases of the work carried out from project inception to construction of the two crossings, first in the spring of 2003 and then in the dead of winter of 2004. Some of the technical considerations inherent in the design of the HDD installations included geotechnical concerns with potential drilling fluid frac-out and slope stability, as well as heat dissipation rates and operating constraints of the 72 kV oil-filled pipe type high voltage cables. This paper will focus on project constraints imposed by the existing urban (park and residential) locations, community and stakeholder concerns and the regulatory and approval requirements of three levels of government. In addition to the necessary geotechnical investigations, other investigations included addressing potential impacts on the river, vegetation, wildlife, archaeological, noise and construction concerns. An extensive public communications program was completed that included a number of open houses, delivery of construction notices to all surrounding residences, meetings with community league executives and other stakeholder groups. The paper will describe the challenges that the project team faced and how they were overcome and the amount of time and effort that went in to meeting those challenges. The paper will end with a discussion of the costs and time frames required to complete such a project.

Copyright © 2004 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In