Decision Making Under Uncertainty in Pipeline Projects Using Monte Carlo Simulation

[+] Author Affiliations
Claudio de Brito Garcia, Leandro Bastos Machado

PETROBRAS, Rio de Janeiro, RJ, Brazil

Paper No. IPC2004-0241, pp. 749-755; 7 pages
doi:10.1115/IPC2004-0241
From:
  • 2004 International Pipeline Conference
  • 2004 International Pipeline Conference, Volumes 1, 2, and 3
  • Calgary, Alberta, Canada, October 4–8, 2004
  • Conference Sponsors: International Petroleum Technology Institute
  • ISBN: 0-7918-4176-6 | eISBN: 0-7918-3737-8
  • Copyright © 2004 by ASME

abstract

Uncertainty about a situation can often indicate risk, which is the possibility of loss, damage, or any other undesirable event. Most people and organization desire low or minimized risk, which would translate to stand to a scenario of high probability of success, profit, or some form of gain. This work shows the importance of risk analysis when it comes to compare two capital investment projects in the natural gas transmission business. A transmission company needs to choose between two alternatives for capacity expansion of a pipeline, with a maximum value for the transmission tariff previously agreed to the shipper. At first, the transmission tariff is calculated by the conventional method that comprises iterative calculation from an arbitrary value, until the project Net Present Value (NPV) reaches zero. Once calculated, the lower of the transmission tariffs associated to the two expansion projects indicates the best choice. That’s the way the majority of companies perform their economical analysis of the proposed problem. Monte Carlo Simulation risk analysis technique is a powerful tool to asses the risk associated to a capital investment project, which can be summarized as the probability of undesired results. The risk calculation is based on the uncertainties associated to the input data used to build the project free cash flow, and the simulation produces a frequency distribution, or histogram, for, the NPV of a project. As will be seen in the work, the investment with the largest expected NPV may not always be the best investment alternative.

Copyright © 2004 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In