0

Full Content is available to subscribers

Subscribe/Learn More  >

Build Sequence Scheduling to Minimize Complexity in Mixed-Model Assembly Lines

[+] Author Affiliations
Xiaowei Zhu, Hui Wang, S. Jack Hu, Yoram Koren

University of Michigan, Ann Arbor, MI

Paper No. ESDA2008-59061, pp. 491-499; 9 pages
doi:10.1115/ESDA2008-59061
From:
  • ASME 2008 9th Biennial Conference on Engineering Systems Design and Analysis
  • Volume 4: Fatigue and Fracture; Fluids Engineering; Heat Transfer; Mechatronics; Micro and Nano Technology; Optical Engineering; Robotics; Systems Engineering; Industrial Applications
  • Haifa, Israel, July 7–9, 2008
  • Conference Sponsors: International
  • ISBN: 978-0-7918-4838-8 | eISBN: 0-7918-3827-7
  • Copyright © 2008 by ASME

abstract

Build sequence scheduling is an important topic in mixed-model production. It is to determine the order of products being built in the assembly line. Significant research has been conducted to determine good sequences based on various criteria. For example, in Just-In-Time production systems, optimal sequences are searched to minimize the variation in the rate at which different parts were consumed. This paper discusses the selection of optimal build sequences based on complexity introduced by product variety in mixed-model assembly line. The complexity was defined as the information entropy that operator processes during assembly, which indirectly measures the human performance in making choices, such as selecting parts, tools, fixtures, and assembly procedures in a multi-product, multi-stage, manual assembly environment. In an earlier paper by the authors, a simple version of complexity measure has been developed for i.i.d. (independent identically distributed) sequences. This paper extends the concept and takes into account the sequential dependence of the choices and its impact on build sequence schedules. A model based on Hidden Markov Chain is proposed to model the sequence scheduling problem with the constraints by spacing rules. Methodologies developed in this paper enhance the previous work on modeling complexity, and provide solution strategies for build sequence scheduling to minimize complexity.

Copyright © 2008 by ASME
Topics: Assembly lines

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In