0

Full Content is available to subscribers

Subscribe/Learn More  >

Theory to Practice: The Realities of New Reactor Licensing Application Docketing and Review

[+] Author Affiliations
Randolph R. Mahan

SCANA Services, Inc., SC

Kathryn M. Sutton

Morgan, Lewis & Bockius LLP, Washington, DC

Douglas J. Rosinski

Ogletree, Deakins, Nash, Smoak & Stewart, P.C., Columbia, SC

Paper No. ICONE16-48852, pp. 1025-1034; 10 pages
doi:10.1115/ICONE16-48852
From:
  • 16th International Conference on Nuclear Engineering
  • Volume 1: Plant Operations, Maintenance, Installations and Life Cycle; Component Reliability and Materials Issues; Advanced Applications of Nuclear Technology; Codes, Standards, Licensing and Regulatory Issues
  • Orlando, Florida, USA, May 11–15, 2008
  • Conference Sponsors: Nuclear Engineering Division
  • ISBN: 0-7918-4814-0 | eISBN: 0-7918-3820-X
  • Copyright © 2008 by ASME

abstract

The first Combined Construction and Operating License (“COL”) applications for new reactors have been submitted to the United States Nuclear Regulatory Commission (“NRC”), and more are expected soon. Preparation of these applications began several years ago based on new regulations in 10 C.F.R. Part 52 (“Part 52”) that are intended to ensure a predictable regulatory environment for new reactor licensing. Indeed, many analysts have opined that the financial viability of new nuclear construction depends largely on reducing economic and regulatory risk associated with the licensing process. In Part 52, the NRC created a new, three-part licensing framework for issuance of Design Certifications (“DC”), Early Site Permits (“ESP”), and Combined Construction and Operating Licenses (“COL”). Applicants are provided the flexibility to build pre-approved designs (DC), on pre-approved sites (ESP), without the need to re-visit issues already decided in earlier proceedings, thereby streamlining issuance of COLs. Thus, Part 52 holds the promise of a more efficient and predictable regulatory licensing process. The promised efficiencies of Part 52, however, are being tested as the NRC begins to review more DC, ESP, and COL applications. Putting new regulatory concepts into practice is always a challenge, and Part 52 is no exception. Thus, it is important to understand the evolving NRC expectations that are beginning to be revealed — expectations that must be understood to successfully license new reactors in the United States. This paper explores the developing implementation of Part 52, discusses how that development is being shaped by current regulatory and engineering realities, and considers the practical impact that these developments will have on engineers designing and constructing new nuclear units in the United States.

Copyright © 2008 by ASME
Topics: Licensing

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In