0

Full Content is available to subscribers

Subscribe/Learn More  >

Plan of Communications and Relationship With Third Parties for the Bolivia-Brazil Pipeline Right-of-Way

[+] Author Affiliations
Márcia Cauduro

TBG, Rio de Janeiro, RJ, Brazil

Paper No. IPC2010-31603, pp. 405-412; 8 pages
doi:10.1115/IPC2010-31603
From:
  • 2010 8th International Pipeline Conference
  • 2010 8th International Pipeline Conference, Volume 3
  • Calgary, Alberta, Canada, September 27–October 1, 2010
  • Conference Sponsors: International Petroleum Technology Institute and the Pipeline Division
  • ISBN: 978-0-7918-4422-9 | eISBN: 978-0-7918-3885-3
  • Copyright © 2010 by ASME

abstract

Objective: This work aims to present to the Plan of Communications and Relationship with Communities implemented by TBG as a tool for the Bolivia-Brazil Pipeline integrity management. Scope: In studies carried out by the European Gas Pipeline Incident Data Group (EGIG), global statistics demonstrate that most accidents involving pipelines are caused by improper actions of third parties. The expansion of sugar cane crops and the improvements in utilities, such as telephone, electricity, water and sewage services in the cities along the pipeline have increased the number of events of interference in the right-of-way. These facts have evidenced the need for creating a Plan of Communications and Relationship with landowners and neighboring communities to assure the continuous monitoring of the Bolivia-Brazil Pipeline right-of-way. The Plan of Communications and Relationship with Communities is designed to reduce the risk of accidents caused by the improper action of third parties. The strategy of action is focused on strengthening the relationships among the right-of-way technical staff, TBG subcontractors, and other publics affected by the pipeline. It also encourages the use of the toll-free Gas Hotline (0800 026 0400) - TBG main communication channel with communities. The intensive publicity targeted at specific audiences ensures that local populations and other relevant publics raise their awareness on the importance of preserving the right-of-way, and the precautions that must be taken in their neighborhoods, mainly in cases of interferences, such as urban improvement projects and farming activities by keeping permanent contact with TBG through the Gas Hotline. This work will also present the interfaces among the right-of-way technical staff, the corporate communications team, and specific target audiences; communication resources, guidelines, technical training programs, Gas Hotline monitoring and management plans, indicators of services provided to the communities and landowners, and the results of the Gas Pipeline Management Program.

Copyright © 2010 by ASME
Topics: Pipelines

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In