0

Full Content is available to subscribers

Subscribe/Learn More  >

Palm Beach County WTE Expansion Model

[+] Author Affiliations
Thomas M. Henderson

Malcolm Pirnie, Inc., West Palm Beach, FL

Leah K. Richter

Malcolm Pirnie, Inc., Plantation, FL

Paper No. NAWTEC18-3530, pp. 113-120; 8 pages
doi:10.1115/NAWTEC18-3530
From:
  • 18th Annual North American Waste-to-Energy Conference
  • 18th Annual North American Waste-to-Energy Conference
  • Orlando, Florida, USA, May 11–13, 2010
  • Conference Sponsors: Solid Waste Processing Division and Environmental Engineering Division
  • ISBN: 978-0-7918-4393-2 | eISBN: 978-0-7918-3868-6
  • Copyright © 2010 by ASME

abstract

Palm Beach County (Florida) Solid Waste Authority built an integrated solid waste management system in the 1980s and 1990s around an 1,800 tpd Refuse Derived Fuel (RDF) Waste-to-Energy (WTE) facility. The system included a network of five regional transfer stations, Subtitle D sanitary landfill, recovered materials processing facility, composting facility, metals processing facility and household hazardous waste collection program. The WTE, which became operational in 1989, was built with two 900 tpd RDF combustion units. Space was provided for the addition of a third combustion unit, a second turbine-generator and an extra flue was installed in the facility’s stack. By 2004, the WTE was fifteen years old. It had been running at over 125% availability and well above its nominal capacity for almost a decade. Landfill capacity was being consumed at a rate which would see it filled in less than 20 years. The County had been hit with repeated hurricanes in recent years and the County’s population was continuing to grow making landfill capacity projections far from certain. The Authority began an assessment of its long term capacity options which included renovation of its existing WTE facility, expansion of that facility, development of a new WTE facility, development of a new Subtitle D Landfill and several out-of-county options. This paper will focus on the results of this assessment with emphasis on the current efforts to develop a new Mass Burn WTE facility with a capacity of 3,000 tpd and a commercial operations date of 2015. It will be the largest new WTE built in North America in more than 20 years. The choice of Mass Burn technology, facility and combustion module sizing, air pollution control technology, facility site selection, environmental permitting, public outreach program, project financing and procurement and contracting approach will be discussed.

Copyright © 2010 by ASME
Topics: Waste-to-energy

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In