S-Lay Installation of Riser Fairings for the Independence Hub

[+] Author Affiliations
Christopher West, Stephen Armstrong, Damon McMillan, Don Allen

Shell Global Solutions (US) Inc., Houston, TX

David McMillan

Design Staff, Inc., Houston, TX

Dean Henning

Independent Contractor, Houston, TX

Basim Mekha

Cuneiform Offshore Consulting, LLC, Houston, TX

D. J. Blockus

Pegasus International, Houston, TX

Dwayne Doiron

Subsea Project Solutions, LLC, Pearland, TX

Mike Lemker

Anadarko Petroleum Corporation, The Woodlands, TX

Paper No. OMAE2007-29416, pp. 515-525; 11 pages
doi:10.1115/OMAE2007-29416
From:
  • ASME 2007 26th International Conference on Offshore Mechanics and Arctic Engineering
  • Volume 1: Offshore Technology; Special Symposium on Ocean Measurements and Their Influence on Design
  • San Diego, California, USA, June 10–15, 2007
  • Conference Sponsors: Ocean, Offshore and Arctic Engineering Division
  • ISBN: 0-7918-4267-3 | eISBN: 0-7918-3799-8
  • Copyright © 2007 by ASME and Shell Global Solutions (US), Inc.

abstract

One of the challenges of insuring adequate fatigue life of marine risers due to vortex-induced vibrations (“VIV”) is the installation of VIV suppression devices in a cost effective manner. In the past, short fairings for production risers have been restricted to J-lay or Reel-Lay installations, where the fairings are installed either before or during pipelay, or retrofit installations where the fairings are installed underwater, using specially designed tooling and Remotely-Operated Vehicles, after the riser has already been installed. Both of these options can be expensive by either restricting the vessels that can install the risers (in the case of J-lay installation) or through expensive rental of ROV and associated equipment for retrofit installation. S-lay installation of fairings is particularly challenging due to the shape of the fairings and the need to install thrust collars to keep the fairings in their axial position once they are installed. Additional complexity is added by the requirement that the fairings be able to withstand mud forces from the temporary placement of the riser on the seabed. These challenges were addressed for the Independence Hub project, which required fairings for both adequate fatigue life due to VIV and for thermal heat transfer considerations. An S-lay testing machine was developed for testing fairings experiencing roller loads up to 115 kips. In addition, wave tank tests were performed to insure that the fairings would stay in proper position during S-lay while experiencing wave forces. Upon successful test results, the S-lay fairings were installed on the Spiderman East, Spiderman West, Jubilee East, Jubilee West, and Merganser flowline risers for the Independence Hub project. These flowline installations are the deepest so far in the world. This required close collaboration by all personnel involved to meet the challenges of insuring success for this type of installation. This paper discusses the methodology used to produce successful S-lay fairing installations for the Independence Hub risers. Presented are test results from the roller and wave tank tests, and a discussion on how the final design was derived. Finally, field experiences from the offshore installations are discussed. This paper should be of interest to engineers involved in the design and installation of deepwater risers.

Copyright © 2007 by ASME and Shell Global Solutions (US), Inc.
Topics: Pipeline risers

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In