0

Full Content is available to subscribers

Subscribe/Learn More  >

40 Years of Combined Cycle Power Plants

[+] Author Affiliations
Lothar Balling

Siemens Power Generation

Heinz Termuehlen

Consultant

Ray Baumgartner

Siemens Westinghouse Power Corporation, Orlando, FL

Paper No. IJPGC2002-26111, pp. 537-548; 12 pages
doi:10.1115/IJPGC2002-26111
From:
  • 2002 International Joint Power Generation Conference
  • 2002 International Joint Power Generation Conference
  • Scottsdale, Arizona, USA, June 24–26, 2002
  • Conference Sponsors: Power Division
  • ISBN: 0-7918-3617-7 | eISBN: 0-7918-3601-0
  • Copyright © 2002 by ASME

abstract

Even though the first installations of combined cycle power plants with heat recovery steam generators (HRSG’s) are only about forty years old, the first attempt to build gas turbines for power generation was made more than 100 years ago. It took however about 40 years before gas turbines were installed to supply peaking power.

Copyright © 2002 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In