0

Full Content is available to subscribers

Subscribe/Learn More  >

Fulfilling the Need for Turbine Retrofits Which Match Demand on “Date and Duration” of Outage

[+] Author Affiliations
Alan Hesketh, John McCoach

Alstom Power, Rugby, UK

Paper No. IJPGC2002-26058, pp. 475-483; 9 pages
doi:10.1115/IJPGC2002-26058
From:
  • 2002 International Joint Power Generation Conference
  • 2002 International Joint Power Generation Conference
  • Scottsdale, Arizona, USA, June 24–26, 2002
  • Conference Sponsors: Power Division
  • ISBN: 0-7918-3617-7 | eISBN: 0-7918-3601-0
  • Copyright © 2002 by ASME

abstract

Retrofitting has in recent years become established as a major field of activity within the steam turbine industry. Third party upgrades by non-OEM suppliers are frequently part of the scene in these days of modern technological advancement. The main drivers for upgrading of this type are improved performance with reduced emissions, increased reliability overcoming emerging type faults and minimized maintenance for the rest of the life of the plant. The practicability in timing of manufacture and installation of a retrofit module, such as a turbine inner cylinder block, is linked intrinsically with the operation of the existing plant and to the outage schedules of each of the units. These plans may extend over a number of years. The evaluated worth of a proposed project is often decided by how quickly, within the remaining life of the overall unit, the retrofit can be supplied to start generating extra revenue. The delivery constraint of hitting an outage window adds a distinctly different aspect compared to the normal supply of a new machine. Time is required to survey the existing equipment, then design and manufacture — with minimum practical times to obtain rotors and casings, followed by shipment, installation, commissioning and testing — all required to match the date and duration of a planned outage. The whole process demands some expertise and close cooperation with plant operator is needed to ensure the optimum solution. Practical examples are discussed to illustrate the challenges involved with turbine retrofitting within specified timeframes and notable achievements are highlighted.

Copyright © 2002 by ASME
Topics: Turbines

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In