0

Full Content is available to subscribers

Subscribe/Learn More  >

MSR Upgrade at Duane Arnold Uses Modularization to Cut Radiation Exposure and Erection Time

[+] Author Affiliations
Eric S. Sorenson, Chester S. Sullivan

Duane Arnold Energy Center, Palo, IA

Abraham L. Yarden, Clement W. Tam

Thermal Engineering International, Los Angeles, CA

Paper No. IJPGC2002-26033, pp. 225-228; 4 pages
doi:10.1115/IJPGC2002-26033
From:
  • 2002 International Joint Power Generation Conference
  • 2002 International Joint Power Generation Conference
  • Scottsdale, Arizona, USA, June 24–26, 2002
  • Conference Sponsors: Power Division
  • ISBN: 0-7918-3617-7 | eISBN: 0-7918-3601-0
  • Copyright © 2002 by ASME

abstract

When the BWR at Duane Arnold went on-line, it was rated at 565.7 MWe. Some time ago, due to operational and other problems it was determined that it would be economical to isolate the HP reheaters from service in the double-stage two Moisture Separator Reheaters (MSRs). Duane Arnold is now undergoing an extensive and lengthy life-extension and uprating program, targeted at 16 percent involving many components. After a detailed study involving several alternative approaches to upgrading the MSRs in conjunction with a new, larger HP turbine, they have now been completely redesigned and reconstructed using essentially the original configuration — 2-pass LP and HP reheaters with chevron moisture separator sections, but using advanced technology throughout and in conjunction with the optimization of the uprated turbine generator. In order to minimize component installation time and reduce personnel radiation exposure, the modern Moisture Separation (M.S.) components were “modularized” — installed as four completely preassembled M.S. sections replacing the need for the in-shell installation of multiple small components. This paper covers the many alternative choices considered and details all elements and phases of the final MSR upgrade design and installation process selected. The installation of a new main turbine, oversized in anticipation of an increase in thermal power, was expected to result in a decrease of about 10 MWe due to throttling losses across the turbine control valves. The refurbished MSR with restored second stage reheat was expected to just offset this loss. Post installation testing showed a gain of 4 MWe beyond the offset of the turbine control valve throttling losses. As a result, the net gain over previous operation is therefore 4 MWe even though the new MSR is responsible for gain of about 14 MWe.

Copyright © 2002 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In