0

Full Content is available to subscribers

Subscribe/Learn More  >

Reprocurement Considerations for an Existing Municipally Owned Refuse-to-Energy Plant: Pinellas County, Florida

[+] Author Affiliations
Warren N. Smith

Pinellas County Utilities, St. Petersburg, FL

Paper No. NAWTEC13-3159, pp. 115-119; 5 pages
doi:10.1115/NAWTEC13-3159
From:
  • 13th Annual North American Waste-to-Energy Conference
  • 13th North American Waste-to-Energy Conference
  • Orlando, Florida, USA, May 23–25, 2005
  • Conference Sponsors: Solid Waste Processing Division
  • ISBN: 0-7918-3756-4
  • Copyright © 2005 by ASME

abstract

On May 7, 2007, the operating agreement for the Pinellas County mass-burn resource recovery facility will expire. This contract, originally negotiated in the late 1970’s is one of the first in the United States for the design, construction, operation and maintenance of a municipally owned refuse-to-energy facility, and thus is one of the first to expire. In late 2003, Pinellas County began the process to reprocure an operator for its resource recovery facility under the terms of a new long-term agreement. This paper discusses planning processes and reprocurement activities to date, including hiring a reprocurement consulting engineer; formation of the project team (Project Working Group and Project Oversight Committee); development of the project schedule; and, identification of the reprocurement approach (informal meetings with vendors, Request for Qualifications and Request for Proposals). The paper also addresses certain technical and contractual issues associated with contracting a 24-year old refuse-to-energy facility. Technical items considered are a modified approach to ash processing and metals recovery; whether or not to continue the WESPhix® ash treatment process; and the need for various capital improvements. Contractual matters include such items as ownership of spare parts; availability of operating documents and record drawings; transfer of proprietary licenses; and consideration of a transition agreement. Pinellas County’s reprocurement is being designed with the primary goal of developing a process that is fair, open and competitive; and one that provides a level playing field for all interested proposers. The paper draws comparisons between the reprocurement methods and processes considered, with conclusions about why the final reprocurement approach was selected.

Copyright © 2005 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In