0

Full Content is available to subscribers

Subscribe/Learn More  >

Short-Term Measurement of a Photovoltaic/Fuel Cell Remote Hybrid Power System at Golden Gate National Recreation Area

[+] Author Affiliations
Andy Walker

National Renewable Energy Laboratory, Golden, CO

Jim Christensen

National Park Service, San Francisco, CA

Greg Barker

Mountain Energy Partners, Nederland, CO

Lyle Rawlings

FIRST, Inc., Hopewell, NJ

Paper No. SED2002-1056, pp. 223-228; 6 pages
doi:10.1115/SED2002-1056
From:
  • ASME Solar 2002: International Solar Energy Conference
  • Solar Energy
  • Reno, Nevada, USA, June 15–20, 2002
  • Conference Sponsors: Solar Energy Division
  • ISBN: 0-7918-1689-3
  • Copyright © 2002 by ASME

abstract

This paper reports short-term performance measurement of a hybrid photovoltaic/fuel cell power supply system at Kirby Cove Campground in Golden Gate National Recreation Area, California. The system operated reliably for two years from June 1999 to July 2001. During this period, the campground host load was met with a combination of solar power and power from the fuel cell. In August of 2001, reports of power outages justified an in-depth investigation. Data is reported over 13.5 days from September 2 to September 15, 2001. Over this period, energy delivered by the photovoltaic array totaled 42.82 kWh. Energy delivered by the fuel cell totaled 1.34 kWh, and net (out-in) energy from the battery totaled 6.82 kWh. After losses in the battery and inverter, energy delivered to the campground host totaled 34.94 kWh, an average of 2.6 kWh/day. Photovoltaic efficiency was measured at 8.9%. Fuel cell efficiency was measured at 42%, which is a typical value, but fuel cell power output was only 35 W instead of the 250 W rated power. Replacing a burnt fuse restored fuel cell power to 125 W, but several cells measured low voltage, and the fuel cell was removed for repair or replacement. Ordinarily, load in excess of the PV capability would be met by the fuel cell, and 22 cylinders of H2 (261 scf, 7,386 sl each) were consumed from April to August 2001. After failure of the fuel cell, load in excess of the solar capability resulted in discharged batteries and eight power outages totaling 48 hours in duration. Thus, overall system availability was 85% when relying only on solar power. This paper describes daily system operation in detail, presents component performance indicators, identifies causes of performance degradation, and provides recommendations for improvement.

Copyright © 2002 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In