Effective Risk Management for In Service Pipelines: Achieving ALARP by Pressure Management and Slab Protection

[+] Author Affiliations
Francis Carroll

APA Group, Brisbane, Australia

Jan Hayes

RMIT University, Melbourne, Australia

Paper No. IPC2018-78170, pp. V002T07A005; 10 pages
doi:10.1115/IPC2018-78170
From:
  • 2018 12th International Pipeline Conference
  • Volume 2: Pipeline Safety Management Systems; Project Management, Design, Construction, and Environmental Issues; Strain Based Design; Risk and Reliability; Northern Offshore and Production Pipelines
  • Calgary, Alberta, Canada, September 24–28, 2018
  • Conference Sponsors: Pipeline Division
  • ISBN: 978-0-7918-5187-6
  • Copyright © 2018 by ASME

abstract

In Australia (and the UK), pipeline operating companies have a regulatory obligation to ensure that their assets are designed, constructed, operated and maintained so that risk to people and the environment is as low as reasonably practicable (ALARP). In many routine cases, demonstration that risk is ALARP is a matter of compliance with relevant technical standards. There are some cases, however, that are more complex.

If a pipeline has been subject to significant urban encroachment and does not conform to current design standards for this service, how does a pipeline operator decide whether risk controls are sufficient? In Australia, rather than either ‘grandfathering’ requirements or mandating retrospective compliance with new standards, operators are required to ensure pipelines are safe and that risk levels are acceptable. The answer in cases such as this is a matter of judgment and we have legal, moral and reputational responsibilities to get decisions such as this right. There is currently no formal requirement in the US for pipeline risks to be ALARP, although the concept is gradually being introduced to US industry safety law. Examples include US offshore well control rules, California refinery safety regulations and the nuclear sector concept of ‘as low as reasonably achievable’.

In this paper, we demonstrate application of the ALARP process to a case study pipeline built in the 1960s that has been heavily encroached by urban development. The Australian risk-based approach required formal ALARP assessment including consideration of options to reduce pressure, relocate or replace the pipeline, or increase the level of physical or procedural protection.

Current and predicted operating conditions on this existing pipeline allowed reduction in operating pressure in some of the encroached segments, sufficient to achieve the equivalent of current Australian requirements for ‘No Rupture’ in high consequence areas for new pipelines. In other areas this was not achievable and a lesser degree of pressure reduction was instigated, in combination with physical barrier protection. The physical barrier slabbing comprised over 7 km of 20 mm thick high-density polyethylene (HDPE) slabs, buried above the pipeline. This approach was new in Australia and required field trials to confirm effectiveness against tiger tooth excavators and rotary augers.

These upgrades to the case study pipeline have significantly decreased the risk of pipeline failure, by reducing both likelihood and consequences of accidental impact. In combination with rigorous procedural controls such as patrol surveillance and community liaison, real risk reduction has been achieved and ALARP has been demonstrated.

Copyright © 2018 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In