0

Full Content is available to subscribers

Subscribe/Learn More  >

Applying Markov Processes for KIC Minimum Configuration Calculation

[+] Author Affiliations
Ke Tan, Guojin Jiang, Yongbin Sun, Huaqing Peng, Ji Shi

China Nuclear Power Engineering Co., Ltd., Shenzhen, China

Paper No. ICONE18-30099, pp. 841-844; 4 pages
doi:10.1115/ICONE18-30099
From:
  • 18th International Conference on Nuclear Engineering
  • 18th International Conference on Nuclear Engineering: Volume 1
  • Xi’an, China, May 17–21, 2010
  • Conference Sponsors: Nuclear Engineering Division
  • ISBN: 978-0-7918-4929-3
  • Copyright © 2010 by ASME

abstract

CPR1000 plant operation is based on a centralized and computerized control mean (the KIC system), that provides all the means needed by the shift team to operate the plant in any situation. There are two main consequences regarding the definition of the KIC configuration. 1) The KIC composition shall be defined so that they are sufficient for the shift team to finish their tasks. It is linked to “Human Factors” concerns as well as organization concerns. 2) The probability of KIC OWP (Operator Work Place) unavailable shall be taken into account in order to figure out the relationship between the fault leading to KIC OWP unavailable and different KIC degraded situation. The technology and architecture choices fix limits to the flexibility and robustness that the KIC can offer regarding its own degraded situations. Therefore, in order to keep a low frequency of use of the Back-Up Panel, it might be needed to adapt and review the operating organization and needs to stay on the KIC by raising the discomfort of operation for the shift team. Nevertheless, such an approach is limited as reducing the discomfort of operation as obviously a price in term of safety notably. Therefore, the KIC degraded situation shall be studied in order to identify the criteria beyond which the safety operation of the plant cannot be ensured anymore from the KIC. After studying the features of the fault leading to KIC OWP key component unavailable, the data from DCS supplier, the data from reference NPP (Nuclear Power Plant) and the statistic during commissioning, the MTBF (Mean Time Between Failures) for each OWP has been calculated. Applying Markov Processes based on the studying above, CPR1000 operation principles, features of SOP (state oriented procedures to deal with accident situation) and PSA, CNPEC suggest the method to calculate KIC minimum configuration for reaching the best balance to maximize the availability of the KIC, to minimize frequency of switch to the Back-Up Panel (conventional control means) and to increase the plant availability (as the switch to the Back-Up Panel can lead to the fallback of the unit).

Copyright © 2010 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In