0

Full Content is available to subscribers

Subscribe/Learn More  >

Condensate Polishing System for PWR Nuclear Power Plant

[+] Author Affiliations
Ailing Wang

Shandong Electric Power Engineering Consulting Institute Co. Ltd., Jinan, Shandong, China

Paper No. ICONE18-29147, pp. 67-72; 6 pages
doi:10.1115/ICONE18-29147
From:
  • 18th International Conference on Nuclear Engineering
  • 18th International Conference on Nuclear Engineering: Volume 1
  • Xi’an, China, May 17–21, 2010
  • Conference Sponsors: Nuclear Engineering Division
  • ISBN: 978-0-7918-4929-3
  • Copyright © 2010 by ASME

abstract

This paper provides summary of domestic in service nuclear power plant condensate polishing system (CPS) configuration, CPS is supplied for all domestic in service nuclear power plant and almost all above sub–critical fossil power plant, so condensate polishing system is necessary for PWR nuclear reactor. Based on USA industrial practice, the raw condensate for startup and normal operation is presented in this paper. Base on EPRI PWR nuclear reactor secondary water chemistry guideline for steam generator blowdown water quality, ion and water balance in secondary system, the effluent water quality for CPS is calculated. The condensate flow is proportional with electric power, during the plant startup operation, the electric power level from 0 to 30% to 50% to 100%, is longer time, i. e. condensate flow from 0 to 30% to 50% to 100%, is longer time. Before the plant electric power level 50% (or 30%), the impurity in condensate is purified, the makeup water for secondary system is demineralied water, the impurity level is lower than requirement, so 50% (or 30%) flow condensate polishing system is enough for startup operation. During the plant normal operation, condensate polishing system is in hot standby, if the condensate tube leak, condensate is deteriorated, the condensate polishing system need to be operated immediately, but CPS put in service from hot standby at least 5 minute. During this period, the units which is once–though cooled by sea water will be shutdown immediately with 2.71/h continuous condensate tube leakage, so full flow CPS is necessary for the units which is cooled by sea water, and it is better that one or two series put in service during normal operation other than all of them in hot standby. The units which is cooled by fresh water will be shutdown immediately with 2561/h continuous condensate tube leakage, for this level leakage, whichever 50%(30%) and 100% CPS, action level 2 will be preformed for the units, so 50%(30%) is enough for fresh water cooled units.

Copyright © 2010 by ASME

Figures

Tables

Interactive Graphics

Video

Country-Specific Mortality and Growth Failure in Infancy and Yound Children and Association With Material Stature

Use interactive graphics and maps to view and sort country-specific infant and early dhildhood mortality and growth failure data and their association with maternal

NOTE:
Citing articles are presented as examples only. In non-demo SCM6 implementation, integration with CrossRef’s "Cited By" API will populate this tab (http://www.crossref.org/citedby.html).

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In